Construction Loans in NSW: How Much You Can Borrow and How Progress Payments Work

A construction loan works differently from the home loan most people are used to. Instead of handing over the full amount at settlement, the lender pays your builder in stages as the house goes up, and you only pay interest on what has been paid out so far.

So how much can you borrow to build, and when does the money actually move?

How a construction loan differs from a standard home loan

With a standard home loan, the full amount is paid out at settlement and you pay interest on all of it from day one.

With a construction loan:

  • the money is released in stages, called progress payments, as each part of the build is finished

  • interest is charged only on the amount drawn so far

  • repayments are usually interest only during the build

  • the lender inspects the build along the way, not just once at the start

Once the home is finished, the loan switches to normal principal and interest repayments.

How much can you borrow for a construction loan?

Lenders look at two things: what the finished property will be worth, and whether your income can carry the loan.

On the value side, the lender orders an "as if complete" valuation, which estimates what the home will be worth once built. Most lenders then lend against the lower of that valuation or your land value plus the build price. If the build costs more than it adds in value, your own contribution needs to cover the gap.

On the income side, you are tested exactly as you would be for any home loan, at your rate plus the 3% buffer APRA requires. If you are renting while you build, lenders include your rent in your expenses too. Our guide How Much Can I Borrow for a Home Loan in Australia? walks through how that assessment works.

The typical stages of a build in NSW

Your building contract sets out a progress payment schedule. Most new homes are paid in five or six stages plus the builder's deposit:

  • Deposit: paid to the builder when you sign the contract

  • Base or slab: the slab is poured

  • Frame: the frame is up

  • Lock-up: external walls, windows and doors are in

  • Fixing or fit-out: internal linings, cabinetry and fixtures

  • Practical completion: the home is finished and ready to hand over

NSW does not have a single legislated payment schedule, so the percentage paid at each stage varies between builders. Lenders compare your builder's schedule with what they consider normal. If a builder asks for too much too early, the lender may only release what it believes the work is worth, and you cover the difference.

How each progress payment gets paid

  • The builder finishes a stage and sends you an invoice.

  • You sign an authority and send it to your lender.

  • The lender may send a valuer to confirm the stage is complete, usually at least at the first and final stages.

  • The lender pays the builder directly.

Allow up to a week or two for each payment. Builders are used to this, but a slow draw can still cause friction, so lodge invoices as soon as they arrive.

Your own money goes in first

This surprises a lot of people. If you are contributing, say, $150,000 of your own savings, most lenders want that money spent before they release anything. The first payments to the builder come from you, and the loan takes over after that.

What lenders need before they approve a construction loan

  • a fixed-price building contract with a progress payment schedule

  • council-approved plans and specifications

  • the builder's licence details

  • Home Building Compensation Fund (HBCF) insurance, which NSW requires for most residential building work over $20,000

  • a list of any items not included in the contract price

Have these ready before you apply. Missing documents are the most common reason construction approvals stall.

What you pay while the house is being built

Interest only, on the balance drawn. Early in the build that is small. By lock-up it is much larger. If you are renting while you build, budget for rent plus steadily rising interest for the full build, which for a new home in Sydney often runs 9 to 15 months.

There are also costs beyond the build price itself, from stamp duty on the land to connection fees and landscaping. Our guide to hidden costs when buying a property in Australia covers what to set aside.

Things that can trip up a construction loan

  • Variations. Changes after you sign push the price up. Lenders usually want you to pay for them yourself or re-approve the higher amount.

  • Owner-builder work. If you plan to do part of the build yourself, far fewer lenders will help, and many will not lend on owner-builder projects at all.

  • Delays. Most lenders expect the build to be finished within a set period, often around 12 months. Ask what happens if it runs over.

  • Land and build together. You can buy land and build in one package, but the land usually settles first and the construction stages follow.

Knock-down rebuilds

Knock-down rebuilds are common across Sydney's older suburbs. You will usually refinance your existing loan into a construction loan, and the lender values the land plus the new home. You will need somewhere to live while it happens, so build rent into your budget from the start.

Planning a build or a knockdown rebuild? See how our construction loan service works, from the first quote to the final progress payment.

Ready to Talk About Your Construction Loan?

We check your builder's payment schedule against lender policy before you sign, so the money flows on time and you are not left covering gaps mid-build. We compare construction loans across our panel of 75 lenders.

📞 +61 485 981 099

📧 Lorenzo@echidnaequity.com

Previous
Previous

Bridging Loans in Australia: How to Borrow for Your Next Home Before You Sell

Next
Next

Cash-Out Refinancing in Australia: How to Release Equity From Your Home